Contact UsContactez Nous
Menu

Interventions on oil wells

Intervention sur un puits sur le lac de Parentis-en-Born (Landes – Nouvelle-Aquitaine).

In order to optimize its tools and maintain or even increase the level of its oil production, Vermilion is working on its existing wells. Since 1997, Vermilion has completed more than 2,300 activities of this type. 

There are 2 types of interventions

  • Pulling, which involves repairing a failed well; 
  • Workover :
      1.  which serves to optimize the production of a well; 
      2.  which serves to replace some equipment on a well;
      3.  which serves to change the pumping system (ESP/PU); 
      4.  which serves to the capping of the well or its compliance upgrade. 

The completion of major investment projects such as repairs, repackaging, and optimizations of oil wells, requires great technical expertise from all the people involved.

Vermilion has recognized expertise in these areas that also addresses the challenges of Health, Safety and Environment. We are committed to developing the resources of the French subsurface in line with all applicable regulations, and in full transparency with stakeholders.


(Unless otherwise noted, references on this website to "Vermilion", or "the Company", or "we", or "our" collectively refer herein to any or all of the people and operations associated with Vermilion Energy Inc. and/or its subsidiaries including its French subsidiary Vermilion Energy France REP SAS whose operations and activities are the focus of this website)

Vermilion REP SAS
Route de Pontenx
40160 Parentis-en-Born, France
Phone +33 (0)5 58 82 95 00
Email vrep@vermilionenergy.com
Emergency Number 0 800 18 32 14
Emergency Number Nouvelle-Aquitaine
0 800 18 32 14
(green number)
Emergency Number Centre
0 800 89 60 18
(green number)
Emergency Number Ile-de-France
0 800 30 20 43
(green number)
  • © 2019 Vermilion Energy Inc.
  • Legal
  • Site by Media Dog